Create a schedule
1
In the Runs tab, select the environment for your scheduled run from the list on the left.
2
Click Schedule a run.
3
A drawer opens where you can configure your schedule:a. Name — give your schedule a descriptive name.b. Type — set to Scheduled for a time-based run.c. Flows to run — run All flows or Flows with selected tags. See Use tags effectively to learn how to tag your flows.d. Concurrency limit — sets the maximum number of concurrent flows to control load on your system. This overrides the value set in Workspace settings → Environment.e. Frequency — choose Every day or Every hour.
The other three options require setup from QA Wolf:
- Deployment — triggers a run from a VCS deployment hook
- Pull Request Testing Button — triggers a run from a custom button in your VCS
- GitHub Deployment — available for teams using GitHub-based deployments
Once you’ve set up schedules for an environment, runs will appear in the Scheduled tab as soon as they are started.
Manage schedules
See all schedules
Open the Runs tab and select an environment. Its schedules are listed under Scheduled.Pause a schedule
1
Click the icon to the right of the schedule, then click Pause. Paused schedules appear in gray text with a status of Paused.
Edit a schedule
1
Click the icon to the right of the schedule, then click Edit. A drawer opens where you can edit your schedule.